Plants that stopped sorting and started preventing

Treadum is built for tire and rubber-product manufacturers between $200M and $40B in revenue, running mixing, component prep, tire building, curing and finishing lines. Here is who we build for and what they hold us to.

Design-partner program open3–5 pilot slots per quarter [ASPIRATIONAL]

Design partners and pilot sites

NORDTREAD GROUPMERIDIAN RUBBERKAIZEN TYRE WORKSVULCAN MOBILITYANDES RADIALHELIOS TYRESOFFROAD DYNAMICSAEROTREAD SYSTEMSNORDTREAD GROUPMERIDIAN RUBBERKAIZEN TYRE WORKSVULCAN MOBILITYANDES RADIALHELIOS TYRESOFFROAD DYNAMICSAEROTREAD SYSTEMS

Where the loop is deployed

Passenger radial

High volume, tight uniformity requirements and an EV-driven shift in load and noise expectations. Usually starts at building and splice or uniformity prediction.

Truck and bus radial

Long cure cycles, high material value per tire and severe consequences from a separation. Usually starts at curing or X-ray defect detection.

Off-road and OTR

Very large constructions, low volume, extreme cost per scrapped tire. Genealogy and cure-state control dominate the business case.

Aircraft

Certification-heavy production where evidence completeness and traceability matter as much as yield.

Specialty and motorsport

Frequent construction changes and small batches, where the twin earns its keep by cutting trial-and-error on the floor.

Technical rubber goods

Hoses, belts and seals sharing the mixing, extrusion, calendering and curing agents without the tire-specific building stack.

Who signs, who champions, who approves

The plant director is the economic buyer. Process and quality engineers are champions. IT/OT, quality and EHS approve.

Economic buyer

Owns production rate, quality, scrap and safety. Wants autonomous, higher-yield, higher-quality production without putting the schedule at risk to get it.

  • Judges Treadum on scrap, first-pass yield, takt and safety
  • Funds pilots from operating budget against a scrap or energy line
  • Needs proof before plant-wide commitment
treadum · director view
$ treadum summary --scope plant --period week
first-pass yield 94.6% (+1.9 pts vs. baseline)
scrap -11% vs. 30-day baseline
cure energy -6.1%
takt 61 s target 62 s
holds 218 false holds 0.11%
no safety incidents · envelope v7 unchanged

What we ask, and what you get

A real pilot, with real access, on a real metric

Design partners get early access, direct engineering time and heavy influence on the roadmap. In exchange we need line access, historian and inspection data under your controls, and an engineer who will argue with the model.

  • You provide: one line, one wedge metric, data access, an engineering champion
  • We provide: connectors, baselining, shadow mode, weekly model review, on-site support
  • Both sides agree the baseline and success criteria in writing before day one
  • Reference rights are negotiated, never assumed

Apply to the program

treadum · design partner status
$ treadum partner status
slots this quarter 3 of 5 filled [ASPIRATIONAL]
wedges available splice · x-ray · cure state · uniformity
typical duration 12 weeks to bounded autonomy
commitment paid pilot, credited on conversion
next cohort opens with the Q3 kickoff

What partners say

“We had three people watching X-ray images and still shipped uniformity rejects. Treadum flagged the cord shift at the building drum, not four hours later at final inspection.”

Ilse VandermeerPlant Director, passenger radial plant [PLACEHOLDER]

“The cure agent found 40 seconds of margin on a construction we had run the same way for eleven years. It proved it in shadow mode before it touched a press.”

Rahul MenonPrincipal Process Engineer, truck & bus radial [PLACEHOLDER]

“Genealogy is the part I did not expect to care about. Every tire now has a linked record from batch to grade, and audit prep went from weeks to an afternoon.”

Camille DuarteQuality Systems Manager, IATF 16949 site [PLACEHOLDER]

[PLACEHOLDER] Design-partner quotes are illustrative until pilot references are published.

What customers are actually trying to fix

Every pilot starts by putting a number on these before autonomy is activated.

Building and mixing that cap rate

Manual, craft-bound green-tire building and mixing limit both throughput and consistency, and the people who do it best are retiring.

Splice, placement and separation

Splice, placement, bubble, separation and bare-spot defects drive scrap and, at worst, recalls.

Force-variation rejects

Uniformity and balance failures cause rejects and rework after all the value has already been added.

Under- and over-cure

Fixed recipes with safety pads waste energy and still leave batch-to-batch drift unaddressed.

Ergonomics and shortage

Ergonomic injury and a severe tire-builder and process-engineer shortage cap rate independent of equipment.

How we assess fit before proposing anything

How we assess fit before proposing anything
CriterionWhat good looks likeWhy it matters
Production volumeEnough tire value on one line for clear ROICell pricing must be small next to the avoided cost
System accessMixing, building, curing, inspection and MES reachable via APIWithout signal there is no model and no baseline
Executive mandateA signed target on yield, scrap or energyPilots without a mandate lose plant resources
Pilot willingnessPaid pilot with a defined success metricFree pilots do not get engineers assigned
Anti-fitDashboard-only expectations or no integration pathTreadum is a system of action, not reporting

Design-partner targets

3–5Design-partner pilots per cohort [ASPIRATIONAL]
12 wkTypical path from kickoff to bounded autonomy
1Wedge metric per pilot — no exceptions
100%Baselines captured before autonomy is activated

Joining the program

Not if you have a line where a point of first-pass yield is material. The Cell plan exists precisely so a single plant can start without a group-level budget.

Yes for perception wedges, which work from live streams. Cure, rheology and uniformity modeling improve much faster with historian depth, so we will ask for it when it matters.

Only with written permission. Reference rights are negotiated as part of the agreement, and several partners run entirely unnamed.

Then we say so and you do not convert. We would rather lose a deal than argue about a baseline nobody agreed to. That is why the baseline is written down before day one.

Put one cell on autonomy in 90 days

Pick one wedge — splice inspection, X-ray defect detection, cure-state optimization or uniformity prediction. We baseline it, run shadow mode, then graduate to bounded autonomy under a signed control envelope.

Pilots start in shadow mode. No line changes until accuracy and safety gates pass.